Dismantling of the Jacky Offshore Platform - Project Management
November 2024

Dismantling of the Jacky Offshore Platform

Client: Ithaca Energy

Contractor: Heerema

Service Provider: NMC Energy

Project: Decommissioning and Removal of the Jacky Offshore Platform

Location: UK North Sea

Summary

NMC Energy was engaged by Ithaca Energy to provide engineering support and oversight for the decommissioning and removal of the Jacky Offshore Platform, executed by Heerema. NMC Energy played a crucial role in ensuring that the dismantling and removal process adhered to stringent safety, environmental, and engineering standards. The project involved comprehensive monitoring, HSE management, and coordination with subcontractors for hazardous material removal, ensuring a seamless and safe decommissioning process.

Scope of Work

NMC Energy’s involvement spanned various critical aspects of the decommissioning process:

Review of Processes and Procedures:

  • NMC Energy participated in reviewing the procedures and methodologies to be employed during the dismantling of the Jacky Platform.
  • The team attended Hazard Identification (HAZID) sessions to evaluate potential risks associated with Load In, Make Safe, and Dismantling operations, ensuring that all foreseeable hazards were identified and mitigated

Progress Monitoring and Control:

  • NMC Energy was responsible for monitoring and controlling the progress of the dismantling operation. This involved close coordination with Heerema, the main contractor, to ensure that all dismantling activities stayed on schedule and complied with predefined safety and engineering standards.

Engineering and Preparations:

  • As part of the engineering oversight, NMC Energy contributed to the planning and preparations for dismantling operations. The team ensured that all engineering aspects, such as structural integrity and lifting procedures, were meticulously designed and followed.

Health, Safety, and Environmental (HSE) Management:

  • NMC Energy worked closely with the contractor, Heerema, to maintain effective HSE interface arrangements. This ensured that the project’s HSE objectives were fully achieved.
  • The team monitored all safety measures in place during the dismantling and load-out processes, ensuring compliance with industry standards and mitigating any environmental impacts.

Hazardous Materials Survey and Processing:

  • NMC Energy monitored the hazardous materials survey carried out by subcontractors, which included identifying and analyzing materials selected for removal.
  • The removal and processing of hazardous materials, including Naturally Occurring Radioactive Material (NORM), from the topside and jacket of the platform, was a key focus. NMC Energy oversaw these operations to ensure safety and adherence to environmental guidelines.

Support to Marine Warranty Surveyor (MWS) and Coordination with Heerema Marine Contractors (HMC):

  • NMC Energy worked closely with the Marine Warranty Surveyor (MWS) to ensure compliance with insurance and regulatory requirements.
  • The team coordinated with Heerema Marine Contractors (HMC) to ensure smooth execution of the lifting, dismantling, and transportation processes.

Material Segregation, Storage, and Transportation:

  • NMC Energy oversaw the segregation and storage of dismantled materials, ensuring that hazardous and non-hazardous materials were properly separated.
  • The team also managed the logistics and paperwork associated with the transport and consignment of materials, ensuring that all movements complied with regulatory and environmental standards.

Oversight of Personnel Competence:

  • NMC Energy provided oversight of the competence of personnel involved in the dismantling operation. The team of full-time client representatives ensured that all workers had the necessary training and understanding of the risks associated with the tasks they were performing, contributing to the overall safety of the project.

Challenges Addressed

Hazardous Material Management:

  • The Jacky Platform contained hazardous materials, including NORM, which posed significant risks during the dismantling process. NMC Energy’s oversight ensured that all hazardous materials were identified, safely removed, and processed according to regulatory standards.

Complex Offshore Environment:

  • Offshore decommissioning projects are inherently complex due to their remote location and challenging environmental conditions. NMC Energy ensured that all activities were meticulously planned and executed, taking into account the unique challenges of offshore operations.

Compliance with HSE Standards:

  • Ensuring compliance with stringent HSE standards was a priority throughout the project. NMC Energy worked with Heerema and other stakeholders to ensure that all safety measures were in place and adhered to, mitigating risks to personnel and the environment.

Key Successes

  • Effective HSE Management: Through continuous monitoring and coordination, NMC Energy ensured that the project achieved its HSE objectives, with no major incidents reported during the dismantling and removal operations.
  • Seamless Coordination with Contractors: NMC Energy’s proactive approach to working with Heerema and other subcontractors facilitated smooth operations and minimized disruptions. The collaboration with the Marine Warranty Surveyor ensured that all lifting and transportation processes met regulatory and insurance requirements.
  • Safe Handling of Hazardous Materials: The successful removal and processing of hazardous materials, including NORM, was a critical achievement. NMC Energy’s oversight ensured that all hazardous materials were safely and efficiently managed, with minimal environmental impact.
  • Efficient Material Segregation and Transport: NMC Energy ensured that all dismantled materials were appropriately segregated, stored, and transported, with comprehensive documentation and compliance with environmental standards.

Outcomes

  • Successful Dismantling of Jacky Platform: The Jacky Offshore Platform was successfully dismantled and removed in line with project timelines and safety requirements. The platform’s topside and jacket were safely transported for disposal, with all hazardous materials properly processed and obtaining regulatory close outs
  • No Major Incidents: The project was completed without any major safety or environmental incidents, demonstrating the effectiveness of NMC Energy’s HSE management and oversight.
  • Regulatory Compliance: NMC Energy ensured that all activities complied with relevant UK regulatory frameworks and industry standards, contributing to the overall success of the project.

Conclusion

NMC Energy’s role in the dismantling and removal of the Jacky Offshore Platform for Ithaca Energy highlights its expertise in managing complex offshore decommissioning projects. Through effective engineering oversight, HSE management, and coordination with key stakeholders, NMC Energy ensured that the project was executed safely, efficiently, and in full compliance with environmental and regulatory standards. This case demonstrates NMC Energy’s capability to handle the challenges of hazardous material removal and offshore dismantling in the demanding North Sea environment.